Skip to: site menu | section menu | main content

Currently viewing: Tabaco Water: » Services

Service Rates

  1/2" 3/4" 1" 1 1/2" 2"
1. Service Connection / Registration Fee 
 a) Service charge and inspecfection fee 100.00 100.00 100.00 100.00 100.00
b) Meter maintenance fee 800.00 1,800.00 4,400.00 9,000.00 15,000.00
d) Installation fee (meter assembly only) 60.00 60.00 60.00 200.00 200.00
c) Tapping fee 40.00 40.00 40.00 100.00 100.00
TOTAL 1,000.00 2,000.00 4,200.00 9,400.00 15,400.00
 
2. Reconnetion fee 250.00
3. Cutting Fee (per linear meter) 100.00
4. Concrete / Asphalt Breaking Fee (per m2) 235.00
5. Piercing/Boring Fee (per linear meter)
 a) 1/2 " 250.00
 b) 3/4" to 1 400.00
 c) 1 1/2" to 2" 1,000.00
 d) 2 1/2" to 3" 1,500.00
e) 4" 2,000.00
6. Restoration fee
a) Concrete ( per cu. m.) 3,860.00
b) asphalt ( per cu. m.) 2,000.00
7. Excavation Cost (includes backfilling)
a) Ordinary soil per cu. m.) 188.00
b) Hard soil ( per cu. m.) 244.00
c) rock/boulder excavation ( per cu. m.) 320.00
8. Pipe Installation / Jointing
a) 1/2" to 1" 5.00 10.00
b) 1 1/2" to 2 1/2" 10.00 30.00
c) 3" to 4" 13.00 70.00
d) 6" 15.00
e) 8" 18.00
f) 10" 35.00
g) 12" 40.00
9. Leak repair and other service fee
a) faucet replacement 50.00
b) plumbling installation (per unit) 3,200.00
     - one lavatory
     - one water closet
     - one shower assembly
     - one floor drain
     - including sanitary & water pipes
     - installation only (excluding materials)
c) other services of plumbers ( per hour) 50.00

Back to top